# Wall Alignment Review Record

Blank project briefing tool. This record contains no product tolerance or manufacturing dimensions. The responsible project parties determine measurement scope and technical suitability.

## A. Identify the record

| Field | Entry |
|---|---|
| Company / project | |
| Opening / room reference | |
| Record revision and date | |
| Surveyed by / contact | |
| Configuration reviewer | |
| Drawing reference and revision | |
| Layout type and proposed enclosure plane | |
| Sketch / photo references | |
| Units used | |
| Viewing direction and positive horizontal direction | |
| Height datum and vertical-reference method | |
| Reading convention: common horizontal coordinates OR offsets from identified reference lines | |
| Reference-line positions / baseline separation, if using offsets | |
| Measuring instrument / method | |
| Surface status: finished or provisional | |
| Outstanding finish work / expected changes | |

## B. Record the geometry

Agree the necessary locations with the installer and configuration reviewer. Add rows as required; this form does not prescribe a sufficient number of measurements for every opening. Measurements refer to the identified plane and declared reference system. State whether readings are common horizontal coordinates or signed offsets from identified vertical lines. Do not calculate width by subtracting offsets with different zero positions; their baseline separation must also be known.

| Reading ID | Height above datum / unit | Left boundary position or signed deviation / unit | Right boundary position or signed deviation / unit | Horizontal separation / unit | Photo / sketch reference |
|---|---|---|---|---|---|
| | | | | | |
| | | | | | |
| | | | | | |
| | | | | | |

| Additional observation | Entry / evidence reference |
|---|---|
| Local bow, finish steps or other surface irregularities | |
| Out-of-plane variation / relevant additional survey | |
| Base / ledge geometry requiring separate review | |
| Readings still provisional, uncertain or conflicting | |

## C. Match the proposed configuration to evidence

| Component / interface | Proposed arrangement | Adjustment function and direction | Applicable limit and conditions, copied from verified document | Source document / revision / page | Technical review result / open item |
|---|---|---|---|---|---|
| | | | | | |
| | | | | | |
| | | | | | |

Do not infer a combined adjustment capacity by adding unrelated values. An empty evidence field means the capability remains unconfirmed.

## D. Close open items before a release decision

| Open item | Required information or action | Responsible party | Evidence / response reference | Closure confirmed by / date |
|---|---|---|---|---|
| | | | | |
| | | | | |

Review outcome — select and explain:

- [ ] Additional survey required.
- [ ] Component / configuration evidence required.
- [ ] Configuration or drawing revision required.
- [ ] Information ready for the named responsible parties to make a release decision.

Decision and reasons:

Reviewed configuration and drawing revision:

Site information confirmed by / date:

Technical review completed by / date:

Drawing release decision by authorised project party / date:

Any later change to finishes, measurements, components or the proposed arrangement must be identified for further review. Completing this form alone does not approve manufacture or installation.