Glass & Hardware / Glass / 01
Glass Selection
Review glass thickness, panel size, framing and door type together before confirming a market-specific specification.

Thickness
Glass thickness is selected with the panel dimensions, frame, opening method and hardware. Send your preference for review; it is not a fixed option across every layout.
Safety and sizing
State your destination market and any required documents. Confirm the glass specification and document scope for the agreed project before ordering.
Finish detail
Clear, printed and patterned glass directions can be reviewed with the selected hardware finish.
Glass review record
Connect glass selection to the complete configuration.
Use this proposed checklist to agree what still needs review for each panel. Provisional opening dimensions support an enquiry; they are not manufacturing sizes. Keep the measurement status visible while the finished opening, hardware interfaces and drawing scope are being confirmed.
| Review item | Project input | Evidence to request | Proposed owner | Unresolved decision |
|---|---|---|---|---|
| Panel geometry | Identify each panel, opening measurements with units, shape and provisional or finished status. | Site measurement record and dimensioned drawing with panel references and revision. | Measurement owner and drawing reviewer. | Which dimensions await finished surfaces or site confirmation? |
| Glass selection | State proposed glass type, thickness, appearance and any coating preference. | Supplier specification for the proposed glass, linked to the panel and intended configuration. | Glass supplier and project reviewer. | Is the proposed selection supported for this configuration? |
| Hardware and configuration | Record door movement, framing, support arrangement and selected hardware references. | Hardware documentation and coordinated drawing showing required cut-outs, holes and edge interfaces. | Hardware supplier and drawing reviewer. | Are glass details coordinated with the actual hardware model? |
| Required documents | Name the destination market, required document type and the party requesting it. | Available records identifying their issuer, scope, document revision and covered configuration. | Buyer’s compliance reviewer and supplier. | Does each record cover the project requirement, or is evidence missing? |
This is a proposed review method, not a fabrication specification or evidence of certification. Agree manufacturing sizes only in the confirmed drawing revision, with the responsible approval owner recorded. A change to the opening, glass or hardware reopens the affected decisions; do not carry an earlier approval across an unreviewed substitution.